Enterprise Architecture

Standards, reference models and the governance that makes them stick.

The boundaries every project works inside, and the function that maintains them.

Engagement

Advisory. A defined piece of architecture work, or standing up the function itself.

Who it is for

CIOs, architects and delivery leads who keep relitigating the same platform decisions.

When people call us

Every project makes its own integration and platform choices, technical debt has no owner, or an architecture function exists and nobody routes work through it.

The practice

01

Business architecture

Capability models and value streams — the view that lets investment and duplication be argued in something other than org charts.

02

Current and target state

What you run today, what the target looks like, and the transition states in between. The middle one is where most architecture work fails to be useful.

03

Principles and standards

A short set of decisions made once: which platforms are strategic, where data lives, how systems integrate, what is allowed at the edges.

04

Reference architectures and patterns

The approved shape for the things you do repeatedly — an integration, a reporting stack, a customer-facing application — so each project is not a design exercise.

05

Application architecture

How the estate fits together, where it duplicates, and what to do about it. The estate view is the application estate review.

06

Technology standards

A maintained catalogue of what is approved, what is tolerated and what is on the way out, with dates attached rather than opinions.

07

Architecture governance

A review process with clear entry criteria, a decision record and a dispensation path — designed to unblock projects rather than queue them.

08

Technical debt

A register with an owner, a cost and a plan, so debt is a managed position rather than a complaint.

09

The architecture function

Roles, decision rights and the working rhythm, where you are standing up the capability rather than buying a deliverable.

What architecture produces

Current, target, and the part that gets funded.

  1. 01
    Capability model

    What the business does, expressed so investment and duplication become visible.

  2. 02
    Current state

    What you run, how it fits together, and where the same job is done three times.

  3. 03
    Target state

    The shape you are heading for, with standards and reference patterns behind it.

  4. 04
    Transition states

    The sequence between them — which capability moves first, and what has to be true before the next one.

The artefact a portfolio can use

Current state is an inventory and target state is a wish. The transition sequence is what a funding conversation can act on, which is why architecture that stops at the target diagram never changes anything.

We build the architecture you need and no more: capability model, current and target state, the standards and reference patterns projects work against, and the review process that keeps them honest.

Architecture that projects route around is not governance

The common failure is a function that reviews late, says no without an alternative, and gets bypassed within two quarters. A review with published entry criteria, a stated turnaround, a decision record and a dispensation path gets used — because it is faster to go through it than around it.

Standards are decisions, not preferences

Which platforms are strategic. Where data is allowed to live. What integration looks like here. Made once, written down with dates against them, and revisited deliberately. Without that, every project relitigates the same four questions and the estate becomes a record of who argued hardest.

Transition states are the useful part

Current state is an inventory and target state is a wish. What gets funded is the sequence between them — which capability moves first, what has to be true before the next one, and which debt is paid on the way. That is the artefact a portfolio conversation can actually use.

What you keep

The code and the data·Your existing relationships·Approval and control·The ability to stop·The off switchWhat that means

Start with a 45-minute briefing.

No pitch. We’ll map your situation against what actually works and tell you honestly where to start.