The main routes.
The lightest route leaves the system as it is and puts a connection in front of it, so that other software can read from it and write to it. The next moves the same software onto current equipment or into a cloud service, without changing what it does.
Heavier routes change the software itself. Parts of it can be reworked or rebuilt one at a time while the rest keeps running. The whole system can be replaced, with a product or with software built for the purpose. The last route is to retire it, where the work it did is no longer needed.
How to choose between them.
The choice depends on what is wrong. If the system does its job and cannot share its information, a connection may be enough. If the equipment is failing and the software is sound, moving it deals with the risk.
Replacement is the most disruptive route and suits a system that no longer fits the work. Doing it in stages, one function at a time, lowers the risk of a single large changeover.
What to do before any of them.
Write down what the system does, including the rules nobody remembers choosing. List who uses it, what it connects to and which reports depend on it.
Then decide what has to keep running throughout. A common cause of trouble is something the old system did quietly that was left out of the plan.
- Also asked as
- What are some effective strategies for modernizing legacy systems?
- Related terms
- Read more
This is general guidance, not advice for your situation.