Suppliers replace models often. A tool built on one version may be moved to a newer one, either by the supplier or by the team that built the tool. The newer model can answer differently, even when it scores better overall.
The practical protection is to know which model a tool uses, to watch for notices and to run the same set of test cases before and after a change. A contract can also set how much notice the supplier must give.
- Also called
- model retirement, model sunset
- How you’ll hear it
- “The supplier announced the deprecation with six months of notice, so the team booked time to test the replacement.”
- Often confused with
- Model drift, in which results change over time while the model stays the same. Deprecation replaces the model itself.
- A question to ask
- How much notice is given before a model is withdrawn, and can a version be kept for a period?
- Related terms
- Read more
The example is fictional. This is general guidance, not advice for your situation.